Showing posts with label bow tie cloche. Show all posts
Showing posts with label bow tie cloche. Show all posts

Tuesday, July 26, 2011

The Best Knitting Compliment

...is seeing your work in use!

Jess wore the pink hat at work today and is very happy with it. I forget how cool it is to make things, because I can. Perhaps if I received a hand turned pottery bowl or carved statue I would have the same feeling about the creative process. Anyway, I am glad it all came together. Go team!

I managed to get a few more rows put on Martha's sweater today. It is coming along nicely and I cracked open the second ball of wool. I love the color, love the pattern, and am getting ready to start the decreases soon. School starts Monday, and I am aiming for the closest delivery date possible. I hope she is just as please with it and wears it often.

Friday, July 22, 2011

Mad Hatter


I knit like a fiend Thursday night and finished the Bow Tie Cloche. It came out really cute. Here it is drying on a conveniently head-shaped ceramic jar. I hope Jessica likes it and can wear it to her chemo treatments.


It was a super easy knit that used the techniques of alternating stripes of color, a little lace and I cord. I was very proud of myself for working in all the ends and finishing the fiddly bow promptly.


Total knitting time, approximately 3 days.

Sunday, July 17, 2011

B-ow!! Tie Cloche

I knit and knit and knit this afternoon and have one repeat (of 4) done of the lace. I am working on two #3 circular needles - my dpns are too short to work comfortably without worrying about stitches falling off the ends. I am hip to finish this today, and I could do it if all I did was knit, but my thumb is telling me it is time to switch projects for a while. Back to Tour de Fleece spinning for me.

Saturday, July 16, 2011

Saddle Sore

I am still spinning away on my Tour de Fleece project. I am on the last puff (12 gr) of the first colorway and can finish tonight if I log off the computer and get back to work.


I started the pink hat last night and am almost finished with the ribbing and ready to start the lace pattern.


Friday, July 15, 2011

WIP Crazy

WIP is work-in-progress and I am about at capacity! I took a bunch of pictures, but must finish charging the camera before I can post them. I feel like my whole life is knitting oriented and I like it very much - at least until my left thumb and wrist tell me it is time to take a break.

The yarn for the hat (the Bow Tie Cloche) and the fingerless mittens for Margaret came in today and it is all gorgeous! I am going to start the hat tonight as soon as I hit "post". I have an early bedtime tonight, but I think I can manage to cast on and knit a couple rows. I should be able to finish the hat this weekend and then start the mitts. We are short staffed at work and next week is going to be somewhat insane... I will either need lunchtime knitting to stay calm and centered, or put it aside entirely so I don't knit all that craziness into the projects. Maybe I can finally finish _The Two Towers_.

The yarn for the Camp Loopy project (mittens - or maybe gloves - with owls on them) has been balled up for quite some time, the pattern is printed, and I am allowed to cast on anytime now. The only hiccough there is that the pattern calls for size 1.5 needles, which I do not own and have actually never seen. I may fiddle with the pattern and make the largest size with a size 1, which should bring down the gauge. The yarn is so fine that I think that making the smallest size with a size 2 needle will not yield a dense enough fabric.

I am still spinning for my Tour de Fleece project - 3/8 done and 5/8 to go!

I added a few rows to Martha's sweater this morning and have about 2" to go until I can start decreasing for the fronts. Note to self - research "3 stitch buttonhole" or decide to leave the dang thing off.